In order of Borough scoring
$197,912.00 old valdez trail (1) bring all of Old Valdez Trail up to Title 17 standards, includes newly annexed area
$1,289,200.00 Skila & Prince upgrade
$349,800.00 resurface last mile of EFR with RAP
$5,593,467.00 pave 8.1 miles EFR
$66,550.00 repair and replace damaged culverts
$99,825.00 Construct apron entrances for farm equipment from fields to existing roads.
$133,100.00 Construct equipment passing pullouts at three locations along EFR
$266,552.00 sawmill trail bring up to Title 17 standards
$91,520.00 sebaugh bring up to Title 17 standards
$193,380.00 repair corner between Sebaugh and 23 Mile Slough Bridge, realign to straighten S curve
Cowpie reconditioning
signage
Thursday, September 3, 2009
Subscribe to:
Post Comments (Atom)
1 comment:
at meeting discussed adding acceleration lane on highway to our "wish list"
Post a Comment